Project Overview
(2) 3 story steel buildings with attached 5 story parking garages, located on the Aquatic Park in Berkeley. Buildings total 470,573 SF and garages total 327,833 SF.
The core/shell buildings are prepped for lab/life science tenants. The building roofs will have over 40,00 SF of green roof area, as well as rooftop solar panels to achieve a net zero energy use for the core/shell.
The façade consists of Curtain wall with bird safe glass, Terra Cotta panels and fins, and metal paneling. Site improvements include a communal elevated deck area between the buildings, as well as a new bike bath and roadway along Bolivar drive.
The project will achieve LEED gold. The project is 100% Union labor.
Project Team
Developer:
General Contractor:
Architect:
Parking Garage Architect:
Structural Engineer:
Geotech:
Civil:
Landscape:
Plumbing:
Electrical:
HVAC:
Sr. Vice President:
Sr. Project Manager:
Project Manager:
Project Engineer:
Project Engineer:
Lane Partners, LB2 Partners, Beacon Capital
Devcon Construction, Inc.
Gensler Oakland
IPD
IMEG
Cornerstone Earth Group
BKF
TLS
Therma
Sprig Electric
Silicon Valley Mechanical
Peter Copriviza
Dana Boesel
Michael Bradley
Michael Tacchela
Raquel Avila